 |
|
|
|
| |
 |
| “The Richardson Team was quick to respond and was able to design, supply, install and commission
our 1250A Automatic Changeover Panel within record time, to ensure minimum down time. This has enabled us to resume production within the shortest possible period. We found the Team to be courteous, competent and professional, during the execution of this project” |
 |
Mr G.M.T. Bandara |
Factory Engineer |
|
|
|
| |
|
|